"New construction" sounds like one thing. In Las Vegas it's three different purchases: a production (tract) home you configure from a builder's menu, a spec (quick move-in) home the builder has already started or finished, or a custom home you design from a bare lot, with semi-custom in between. Each path has its own price, timeline, financing and level of control.
Nevada Real Estate Group has 9,600+ closed transactions over 16+ years. This guide breaks down spec vs custom vs production: what each one is, what it costs in 2026, how long it takes, how you finance it and how to choose.
Production homes are builder floor plans you order and configure; KB Home cites 30 to 50 days of loan, design and permit steps, then a four-to-five-month average build. Spec (quick move-in) homes are started or finished before you sign. Custom homes are designed for your lot; Census data put 2025 contractor-built homes in the West at 14.0 months of construction alone. Semi-custom sits between production and custom.
- Production builders' median new-home sale prices ran from $419,990 for Beazer to $875,000 for Toll Brothers.
- On October 31, 2026, 26 of KB Home's 34 "Available Now" Las Vegas homes carried late-November move-in dates.
- Census data put 2025 contractor-built homes in the West at 14.0 months from start to completion.
- Custom usually needs a construction loan; spec and production homes close on a standard purchase mortgage.
- The on-site builder rep works for the builder, so decide on your own agent before visiting.
| Factor | Production (to-be-built) | Spec (quick move-in) | Semi-custom | Custom |
|---|---|---|---|---|
| What it is | Builder plan you order on a chosen lot | Builder home already under construction or complete | Builder plans with more structural options and finishes | Designed for your lot by your architect or a design-builder |
| Price benchmark | Median MLS sale price by builder group: $419,990 to $875,000 (production and spec combined) | Same builders and plans; nine Toll quick move-ins at Elkhorn Grove ran $700,000 to $875,000 | No separate public figure | Christopher Homes' SkyVu marketed at $2.5 million to over $6 million; Ascaya estate homesites from $1 million before the house |
| Timeline | About 5–7 months by KB Home's figures; Toll: 6–12 months on average | Finished: your loan's schedule. Unfinished: the builder's date | No separate public figure; get the schedule in writing | Census West 2025: 1.5 months permit to start, then 14.0 months to complete, before design |
| Design control | Menu options | Little or none; depends on the construction stage | Structural options and a finish menu | Total |
| Financing | Standard mortgage | Standard mortgage | Depends on who owns the lot; ask the lender | Usually a construction loan |
| Main requirement it serves | A new home with some choice | A near-term move date | More design choice without a blank sheet | A specific design on a specific lot |
Sources: our pull of Las Vegas MLS data through Repliers on November 1, 2026, by closing date; KB Home, Toll Brothers, Christopher Homes and Ascaya websites; the Census Survey of Construction. Semi-custom is a marketing label with no public measure, and it follows our custom-home guide.
For the full picture of builders and master-plans, see our new construction hub. This guide is about choosing among the buying paths.
What Are the Three Ways to Buy New Construction in Las Vegas?
A quick move-in home is one the builder has already started or finished, so you buy it on the builder's schedule with most choices made. A build-to-order home is one you contract for before construction starts, choosing the lot, plan and options, then waiting roughly five to seven months by KB Home's figures. According to the Toll Brothers FAQ, its quick move-in homes are "either under construction or already complete," often still letting you select "many of the final fixtures and features." So quick move-in doesn't always mean finished, and it doesn't always mean nothing is left to choose.
Four labels cover the rest. A production home (also called a tract or "to-be-built" home) is one of a builder's standardized floorplans that you order on a chosen lot, selecting structural options and finishes from a menu before construction starts. A spec home, short for "speculative" and marketed as a "quick move-in" or "inventory" home, is a production home the builder started on its own bet. A custom home is designed for your lot with your own architect and a licensed builder, with no menu and no template. A semi-custom home sits between production and custom: you start from a builder's plans but get more structural changes and finishes, often on the builder's lot. Semi-custom is a marketing label with no legal definition I could find, so ask exactly which changes are allowed. Our custom-home guide compares it with true custom.
The simplest way to think about it: production is build-to-order from a catalog, spec is buy it as it stands, semi-custom is a catalog with more freedom, and custom is design from scratch. The labels matter because each path runs on its own clock and its own contract. Finished homes are now most of what sells: according to the Census Bureau's new houses sold by stage of construction, 396,000 of the 678,000 new homes sold nationally in 2025 were already completed when they sold, 215,000 were under construction and 67,000 had not been started. The bureau does not publish that split for Las Vegas, where custom homes concentrate in a handful of luxury hillside enclaves.

What Is a Production Home and Who Builds Them in Las Vegas?
A production home is the backbone of Las Vegas new construction. You choose a community, a floorplan, and a lot, then visit the builder's design center to select options — flooring, cabinets, countertops, and a limited set of structural choices like a casita, a loft, or an extended garage. The builder then constructs your home alongside dozens of others using the same plans, which is exactly why it's affordable: standardized plans and bulk purchasing keep costs down.
The valley's production builders include Lennar, KB Home, D.R. Horton, Pulte and Del Webb, Richmond American, Tri Pointe, Century Communities and Toll Brothers. They build across the major master-plans — Summerlin, Cadence and Inspirada in Henderson, Skye Canyon, Valley Vista, and the Tule Springs communities in the northwest. According to Summerlin's builder page, read November 1, 2026, nine builders sell there: KB Home, Lennar, Pulte Homes, Richmond American Homes, SHAWOOD, Taylor Morrison, Toll Brothers, Tri Pointe Homes and Woodside Homes.
Pricing is broad. In our pull of Las Vegas MLS data through Repliers on November 1, 2026, covering homes flagged new construction that closed from October 1, 2025 through September 30, 2026 in Las Vegas, Henderson and North Las Vegas, the median sale price by builder group ran from $419,990 for Beazer and $432,900 for LGI Homes through $494,690 for KB Home and $574,000 for Lennar to $796,999.50 for Pulte and Del Webb and $875,000 for Toll Brothers. These run by closing date, so they differ from the September pull in our builder comparison, which explains how builder names are grouped. The trade-off for that range is control: you get the builder's menu, not a blank canvas. For help negotiating the contract, our guide to builder contract clauses worth negotiating is the place to start.
What Is a Spec Home (Quick Move-In) and When Is It the Smart Buy?
A spec home is a production home the builder chose to build without a buyer attached, on speculation that someone will want it. These "quick move-in" or "inventory" homes are for buyers who can't wait the roughly five to seven months a to-be-built home takes by KB Home's published figures. Most finishes are already chosen. "Quick" doesn't always mean finished: KB Home's Las Vegas-area move-in-ready list, as saved October 31, 2026, labeled 34 of 37 homes "Available Now," but 26 of those 34 carried late-November move-in dates (as our build-timeline guide reports). On November 1, 2026, the nine quick move-ins on Toll Brothers' Elkhorn Grove page carried move-in dates from November 2026 to April 2027.
Spec homes also fit the way some builder financing offers are written, because they require a closing soon. According to Freddie Mac's Primary Mortgage Market Survey, the 30-year fixed rate averaged 7.24% on October 29, 2026, up from 6.37% in the week of April 9. Lennar's Black Friday Sales Event, read November 1, 2026, showed a conventional 2-1 buydown at 2.99% in year one, 3.99% in year two and 4.99% for the rest of the term (5.089% APR) for select homes signed by November 1 that fund by November 20. Only a home near completion could meet that date, and the signing window closed that day, so treat it as an example of how these terms work. The terms that replaced it, as shown on Lennar's page November 4, 2026, an FHA 5/1 ARM at 3.99% (4.062% APR) for agreements signed November 2 to 8, carry the same kind of deadline: close and fully fund by December 18. Our breakdown of builder closing-cost credits shows how to compare them.
The catch is simple: you mostly take the home as it stands. If the finishes suit you, a spec home is a fast way into new construction. If you have strong design opinions, it won't fit. If your move date is fixed, the date may decide it.

What Is a Custom Home and What Does It Cost in Las Vegas?
A custom home is a different universe. You buy a lot — typically in a luxury hillside enclave like The Ridges, MacDonald Highlands, Ascaya, or The Summit Club — then hire an architect to design the home and a licensed custom builder to construct it. There's no floorplan menu and no template; every wall, window, and finish is a decision you make. The result is a one-of-a-kind home, and the price reflects it.
Start with the land and the build as two separate numbers. According to Ascaya's homesites page, read November 1, 2026, its Estate Homesite Collection runs from about half an acre to over two acres, "priced from $1 million," and its 58 Cloud Rock homesites from $2 million to $8 million, before any house. For the build, the Census Bureau's contract-price-per-square-foot table put the average for contractor-built houses started in the West in 2025 at $213.85 per square foot, excluding the lot; a luxury hillside home can run well above a regional average, so get a builder's written estimate. For a finished-product benchmark, Christopher Homes marketed its SkyVu design-build homes in MacDonald Highlands at "$2.5 million to over $6 million" on November 1, 2026. The valley's established custom builders include Blue Heron, Christopher Homes, Sun West Custom Homes, and Merlin Custom Home Builders; our luxury builder guide lists who is selling where. A builder you hire needs an active Nevada contractor's license, so check it first on the Nevada State Contractors Board's license search.
Custom fits when the home itself, its design, lot and views, is the requirement and the budget and timeline can carry it. Browse the high-end market on our luxury communities hub.
How Long Does Each New-Build Path Take?
Timeline is where the paths diverge most sharply. No public source measures semi-custom builds separately, so the table leaves it out.
| Stage | Production | Spec | Custom |
|---|---|---|---|
| Design / selections | Part of KB Home's 30 to 50 days of loan, design and permit steps | None (already chosen) | No public benchmark; get the architect's schedule in writing |
| Permitting | Clark County reviews and permits standard plans subdivision by subdivision; Census West built-for-sale homes averaged 1.3 months from permit to start (2025) | Done | Clark County first-review goal 21 days plus 10 per correction; September 2026 residential average 19.00 days; a lot inside city limits can fall to a city department; Census West contractor-built 1.5 months from permit to start |
| Construction | KB Home: four to five months on average; Census West built-for-sale: 6.4 months (2025) | Finished, or the builder's estimated date | Census West contractor-built: 14.0 months (2025) |
| Total to move-in | About five to seven months by KB Home's figures; Toll Brothers: 6 to 12 months on average | Finished: your loan's schedule (CFPB: locks typically 30, 45 or 60 days) | More than 15 months of permit-to-start and construction alone; Blue Heron plans custom homes "over the course of 12-18 months" |
Sources: KB Home's timeline page, the Toll Brothers FAQ, Blue Heron's design-build page, the Census Bureau's length-of-time tables, Clark County's plan review timelines, standard plan guide BPG-186 and September 2026 timeliness report, and the CFPB, all read November 1, 2026.
A finished spec home can close as fast as your lender, appraiser and title company can work; one still under construction closes when the builder finishes it, so ask what stage it is in today. A production home is roughly a five-to-seven-month commitment by KB Home's published figures, and Toll Brothers says its homes take 6 to 12 months on average, varying by region and community. A custom home runs well over a year: the Census Bureau puts construction alone at 14.0 months for contractor-built homes in the West, after 1.5 months from permit to start, and plan review comes before that. Clark County sets a 21-day first-review goal for its own reviews. A lot inside city limits can fall to a city department instead, such as Las Vegas Building & Safety, so confirm who reviews your plans and ask for its timeline. Our build-timeline guide breaks down every stage, and our custom-home guide plans for 18 to 24 months from lot search to keys. If you're selling a home in another state or starting a job on a date certain, the timeline difference is not a detail — it's the decision.
How Much Does Each Option Cost in 2026?
Price overlaps more than people expect between production and spec (they're the same floorplans, after all), while custom sits in its own tier.
| Builder or product | Path | Price | Basis |
|---|---|---|---|
| Beazer | Production and spec | $419,990 | Median MLS sale price, 87 sales |
| KB Home | Production and spec | $494,690 | Median MLS sale price, 214 sales |
| D.R. Horton | Production and spec | $495,990 | Median MLS sale price, 371 sales |
| Lennar | Production and spec | $574,000 | Median MLS sale price, 128 sales |
| Richmond American | Production and spec | $669,950 | Median MLS sale price, 287 sales |
| Pulte / Del Webb | Production and spec | $796,999.50 | Median MLS sale price, 58 sales |
| Toll Brothers | Luxury production and spec | $875,000 | Median MLS sale price, 57 sales |
| Christopher Homes, SkyVu | Design-build custom | $2.5 million to over $6 million | Builder marketing, November 1, 2026 |
| Ascaya estate homesites | Custom (land only) | From $1 million | Developer's homesites page, November 1, 2026 |
| Contractor-built homes, West region | Custom (build only) | $213.85 per square foot, excluding the lot | Census average for houses started in 2025 |
Sources: our pull of Las Vegas MLS data through Repliers on November 1, 2026 (not official Las Vegas REALTORS statistics; flagged new construction, built 2025 or later, Las Vegas, Henderson and North Las Vegas, all home types); Christopher Homes and Ascaya websites; U.S. Census Bureau Characteristics of New Housing.
According to Las Vegas REALTORS, as reported by FOX5, the median price of existing single-family homes sold in September 2026 was $470,000, level with a year earlier. Several builders' medians in our 12-month pull sat within about 6% of that figure, including KB Home at $494,690 and D.R. Horton at $495,990, so at the entry level a new home can price near the resale median. The two figures cover different windows and home types, and our new vs resale comparison shows what size and lot each bought at about $500,000. Custom is a separate calculation: the lot and the build cost are independent line items, so ask the architect and builder in writing what contingency they recommend.
How Does Financing Differ for Spec vs Custom vs Production?
This is the most overlooked difference, and it surprises buyers. Spec and production homes are financed with a standard mortgage — conventional, FHA, VA, or jumbo — that funds at closing, exactly like a resale purchase. For a to-be-built production home, you sign the contract and put down an earnest-money deposit, then lock your loan as completion approaches. For a spec home, it's a normal close on a finished property.
A custom home is different: it usually requires a construction loan, often one that converts to a permanent mortgage at completion. According to the Consumer Financial Protection Bureau, a construction loan is usually a short-term loan, generally carries a higher interest rate than a longer-term purchase mortgage, and is typically paid out "in a series of advances as the construction progresses," with payments sometimes starting six to 24 months after the loan is made. Ask each lender for its down-payment, budget and draw-schedule requirements in writing. Production and spec buyers skip all of that, but a to-be-built buyer still has to plan the rate lock: the CFPB says locks are typically available for 30, 45 or 60 days and may be expensive to extend, so ask when the lender will lock. Whatever path you choose, getting pre-approved first tells you which homes are realistic before you fall in love with one.
How Much Control Do You Get, and What Are the Risks of Each Path?
Control is the trade you make for speed and price. Here's the spectrum:
| Element | Production | Spec | Custom |
|---|---|---|---|
| Floorplan | Builder menu | Fixed (as built) | Designed from scratch |
| Lot selection | Available lots | Fixed | You choose / own the lot |
| Finishes | Design-center options | Mostly pre-selected; some may remain, depending on stage | Your choice |
| Structural changes | Limited options | None | Anything code allows |
The hidden cost in production homes lives at the design center, where upgrades add up, so get every option priced in writing and set a cap before the appointment. Our guide to keeping your design-center budget in check walks through which upgrades hold value and which to skip. Spec homes mostly sidestep that, and custom homes hand you every decision, which is the appeal and the burden at once. On a quick move-in, ask for the list of options the builder already installed, so you know what the price includes.

Every path carries different risks. With a production home, the main exposures are rate movement during a build that runs roughly five to seven months by KB Home's figures (you may not lock until late; the 30-year Freddie Mac average moved from 6.37% in the week of April 9, 2026 to 7.24% on October 29) and design-center overspending. With a finished spec home, the home exists and the price is set, though you give up customization. With a custom home, you carry cost overruns, schedule slippage, builder disputes and any gap between the budget and the final appraisal, subject to your contract.
According to the Nevada State Contractors Board, its Residential Recovery Fund is available only to owners of single-family homes who contracted with a licensed residential contractor and have exhausted other means of recovery, it can't exceed $40,000, and it isn't available to homeowners who hired unlicensed contractors. That is one more reason to use a written contract with a licensed builder on a custom build. On a production or spec purchase, read the builder's contract and warranty before you sign.
Where Do You Find Each Type, and How Do They Compare on Resale?
Geography sorts the paths. Production and spec homes are everywhere new development is happening: Summerlin's newer villages, Cadence and Inspirada in Henderson, Skye Canyon and Valley Vista in the northwest, and the fast-growing far-northwest around Tule Springs. Custom homes cluster in the guard-gated luxury hillside communities — The Ridges in Summerlin, MacDonald Highlands and Ascaya in Henderson, and The Summit Club. Spec inventory follows the active subdivisions.
According to the U.S. Census Bureau's Vintage 2025 county estimates, Clark County reached 2,407,226 residents on July 1, 2025, with net domestic migration of 8,465 people in 2025, and the bureau's Building Permits Survey counted 9,422 single-family homes authorized across the Las Vegas-Henderson-North Las Vegas metro in 2025. New production neighborhoods sit mostly on the valley's edges, where developable land remains. Compare communities side by side on our community directory, and for the city's most active new-build corridor, see our Henderson guide.
No public source measures this for the valley, so I won't state a premium or a resale return for any path. In our same-budget MLS comparison, new homes and resales at about $500,000 closed at nearly the same median size, which argues against assuming a fixed premium in either direction. Spec and production homes are standardized, so a nearby resale of the same plan usually gives you a comparable. A custom home has few direct comparables, and a highly personal design may narrow the next buyer pool.
Compare a new home's price with recent resales in the same master plan before you sign, and treat any future value as unknown.

Should You Use Your Own Agent, and Which New-Build Path Is Right for You?
You don't have to, but decide before you visit. The representative at the builder's sales office works for the builder and doesn't represent you. If you hire an agent, you'll sign a written buyer agreement before touring, and according to the National Association of REALTORS' consumer guide, the compensation in it is negotiable and not set by law, and you can still ask the seller, here the builder, to pay your agent. Ask the sales office in writing whether it will, before you write an offer.
The catch: builders commonly require your agent to be registered at your first contact with the community. Lennar's Broker Participation Policy, for example, makes an agent ineligible for a commission if the buyer doesn't register the agent at first contact, and requires the agent to accompany the buyer on the initial visit. Our guide to using a Realtor on a new build compares the KB Home, Toll Brothers and Lennar terms. Call (702) 637-1759 before your first builder visit and we'll explain how representation and our compensation work before you tour.
A quick decision guide by requirement:
- You need to move in under 60 days: a spec (quick move-in) home marked move-in ready or available now.
- You want a new home with some choice: production, with your plan and finishes.
- You want more design changes without a blank sheet: semi-custom, after asking exactly what can change.
- Your offer depends on a quick closing: spec, because some builder offers set a closing deadline.
- You have a seven-figure budget and a specific design: custom, with the most control and the longest timeline.
If a home is labeled quick move-in, ask for its completion month in writing; on November 1, 2026, Toll's nine Elkhorn Grove quick move-ins ran from November 2026 to April 2027. A useful test is to compare a spec home and a to-be-built home in the same community, so you can weigh speed and offers against choice. For a custom path, line up the lot, the architect and the construction lender before you commit to a move date. Start on our new construction hub or call (702) 637-1759.
Frequently Asked Questions
What is the difference between a spec home and a production home?
A production home is built to your order from a builder's floorplan menu after you sign a contract; KB Home cites 30 to 50 days of pre-construction steps, then an average four-to-five-month build, and Toll Brothers says 6 to 12 months on average. A spec (speculative or "quick move-in") home is the same kind of home the builder started without a buyer, with finishes pre-selected, so you buy it as-is and, once it is finished, close on your loan's schedule. Same floorplans, different timing and customization.
Are spec homes cheaper than custom homes in Las Vegas?
Usually far cheaper. In our MLS pull of new-construction closings from October 2025 through September 2026, median prices by builder group ran from $419,990 for Beazer to $875,000 for Toll Brothers, covering production and spec homes alike. On the custom side, Ascaya's estate homesites were priced from $1 million before any house on November 1, 2026, and Census put the 2025 average for contractor-built homes in the West at $213.85 per square foot, excluding the lot.
How long does it take to build a custom home in Las Vegas?
Well over a year. Census data put 2025 contractor-built homes in the West at 1.5 months from permit to start and 14.0 months from start to completion, before design. Clark County's first plan review goal for a custom single-family home is 21 days, with 10 days for each correction, and its residential reviews averaged 19.00 days in September 2026; a lot inside city limits can fall to a city department instead. Our custom-home guide plans for 18 to 24 months from lot search to keys. Production homes take roughly five to seven months by KB Home's figures.
Do I need a special loan for new construction?
Usually only for custom. Production and spec homes use a standard mortgage (conventional, FHA, VA, or jumbo) that funds at closing. Custom homes usually need a construction loan; the CFPB says these are usually short-term, generally carry higher rates than purchase mortgages and are typically paid out in advances as construction progresses. Many convert to a permanent mortgage at completion. Ask each lender for its down-payment and draw requirements in writing.
What is a semi-custom home?
A semi-custom home starts from a builder's plans but allows more structural changes and finishes than a production menu, often on the builder's lot. It's a marketing label, not a legal category. No public source measures its price or build time separately in Las Vegas, so ask which changes are allowed and get the schedule in writing.
Can I negotiate the price on a new construction home?
Often, though the builder decides. In our MLS pull, 73% of new single-family homes closed below original list from October 2025 through September 2026. Builders can also move on rate buydowns, closing-cost credits, design allowances and lot premiums. Ask for the builder's current offer sheet in writing.
Should I bring my own agent to a new home builder?
It's your choice, but decide before you visit, because the on-site rep works for the builder. With an agent you'll sign a written buyer agreement before touring; under NAR's guidance the compensation is negotiable, and you can ask the builder to pay it. Builders commonly require registration at first contact; Lennar's policy makes an agent ineligible for a commission otherwise.
Which is the best new-build option for a fast relocation?
A finished spec (quick move-in) home. It's already built, so you can inspect it and close on your loan's schedule; the CFPB says rate locks typically run 30, 45 or 60 days. Check the label, though: on KB Home's October 31, 2026 Las Vegas-area list, 26 of the 34 homes labeled "Available Now" carried late-November move-in dates. Production homes take roughly five to seven months by KB Home's figures and custom homes far longer.
Which Sources Inform This New-Construction Guide?
Builder prices, listings and build-time statements were read on the builders' own sites on November 1, 2026 unless dated, and Lennar's offer page was re-checked November 4, 2026; KB Home's move-in-ready counts come from the list saved October 31 in our build-timeline guide. Offers change with each sales event. New-construction medians are from our own pull of Las Vegas MLS data through Repliers on November 1, 2026, by closing date, not official Las Vegas REALTORS statistics.
- Length of time from authorization to start and from start to completion, 2025, houses sold by stage of construction and contract price per square foot — U.S. Census Bureau
- Vintage 2025 county population estimates and Building Permits Survey, metro annual 2025 — U.S. Census Bureau
- Plan review timelines, September 2026 timeliness report and standard plan guide BPG-186 — Clark County
- How long is the homebuilding process — KB Home
- Frequently asked questions and Elkhorn Grove quick move-ins — Toll Brothers
- Las Vegas Black Friday Sales Event and Broker Participation Policy — Lennar
- Summerlin builders — Summerlin
- SkyVu — Christopher Homes; design-build — Blue Heron; homesites — Ascaya
- Primary Mortgage Market Survey: 7.24% on October 29, 2026 and history: 6.37% on April 9, 2026 — Freddie Mac
- What is a construction loan? and What's a lock-in or a rate lock? — Consumer Financial Protection Bureau
- Las Vegas REALTORS report, October 6, 2026 — FOX5
- Consumer guide to written buyer agreements — National Association of REALTORS
- Residential Recovery Fund and license search — Nevada State Contractors Board
Builder-process detail draws on our guides to build timelines, builder contract clauses, builder closing-cost credits, and design-center budgeting. Prices, incentives, and rates change — verify current figures before acting.
Information deemed reliable but not guaranteed. This article is educational and is not financial advice — builder pricing, incentives, loan terms, and construction costs change over time and vary by community. Confirm current details with a qualified professional before buying. Nevada Real Estate Group · (702) 637-1759 · NV License S.181401.