People who search for Silver Springs real estate usually have a budget question in mind: what does a house with some land cost east of Reno, past Fernley and Dayton? The listings answer only part of it, because most of what sells in ZIP 89429 is not a site-built house at all. It is a manufactured home on an acre or more, often with its own well and septic tank, and the vacant land around it sold for a median $42,000 for more than four acres from October 2023 through September 2026.
So we pulled every agent-listed sale in ZIP 89429 from the Northern Nevada Regional MLS with a closing date from October 1, 2023 through September 30, 2026, plus every listing on the market on November 18, 2026. That gave us 456 home sales, 335 land sales and 228 listings, split between the two towns that share the ZIP code: Silver Springs, around the U.S. 50 junction near Lahontan Reservoir, and Stagecoach, to the west toward Dayton. The tables below show prices by town, home type, lot size and age, then the water, sewer and tax questions that decide what a property really costs to own.
The middle half of home sales in Silver Springs and Stagecoach, Nevada closed between $275,000 and $380,000. Of 456 MLS home sales in ZIP 89429 from October 2023 to September 2026, 386 were manufactured homes, at a $322,370 median on a one-acre lot, and 70 were site-built houses, at a $375,000 median. Vacant land sold for a median $42,000 on 4.4 acres.
- 85% of 456 home sales (October 2023 to September 2026) were manufactured homes.
- Stagecoach sold higher over the 36 months: $349,900 manufactured and $460,000 site-built medians.
- Lots under half an acre had town water and sewer; 2.5 acres and up, a well and septic.
- Land (October 2023 to September 2026) took 77 days to sell and closed at 88% of its first price.
- Taxes, water and septic vary by parcel, so check each one before you offer.
| Measure | Silver Springs | Stagecoach | Whole ZIP 89429 |
|---|---|---|---|
| Manufactured-home sales | 295 | 91 | 386 |
| Median manufactured-home price | $310,000 | $349,900 | $322,370 |
| Site-built house sales | 39 | 31 | 70 |
| Median site-built price | $340,000 | $460,000 | $375,000 |
| Median site-built lot | 1.0 acre | 2.0 acres | 1.2 acres |
| Vacant land sales | 278 | 57 | 335 |
| Median land price | $35,000 | $82,500 | $42,000 |
| Houses on septic | 21 of 39 | 31 of 31 | 52 of 70 |
What do homes in Silver Springs and Stagecoach sell for?
Across the 36 months from October 2023 through September 2026, the 456 homes that sold in ZIP 89429 split into two very different groups. The 386 manufactured homes closed at a median $322,370, about $213 per square foot, on a median 1,479 square feet and one acre of land. The 70 site-built houses closed at a median $375,000, about $243 per square foot, on 1,642 square feet and 1.16 acres. Both groups were built around the same time: the median home of either kind dates from 1999.
The newest 12 months, October 2025 through September 2026, look much the same. The 128 manufactured homes that closed in that year sold for a $332,000 median, and the 21 site-built houses for $375,000. The range is wide. Manufactured homes sold from $50,000 for a small, older unit to $579,000 for a newer home on acreage, and site-built houses from $100,000 to $630,000 in the latest year.
Those medians put ZIP 89429 below Fernley and Dayton for a site-built house, on far more land, as the comparison further down shows. Two cautions apply before you budget from them. First, most of the homes are manufactured, and the loan, insurance and resale questions on a manufactured home differ from those on a site-built house, which the sections below cover. Second, the median hides a large lot-size effect: a manufactured home on less than half an acre in town sold for a $250,000 median, while one on five acres or more sold for $397,000. If you are shopping by budget, decide first how much land you need and whether you want public water, because those two choices move the price more than the town name does.
For current homes on the market, our Silver Springs homes page and Stagecoach homes page list what is for sale today.

Why are most homes sold here manufactured homes?
In the 12 months ending September 30, 2026, manufactured homes made up 128 of the 149 detached homes that sold in ZIP 89429, or 85.9%. In Dayton's ZIP 89403 the share was 9.4% (39 of 417) and in Fernley's ZIP 89408 it was 5.6% (24 of 426). Over the full 36 months the Silver Springs and Stagecoach share was 84.6%, 386 of 456. Neither of the two neighbouring ZIP codes we checked is close.
The sales point to the reason. Most homes that sold in ZIP 89429 sat on rural lots of an acre or more rather than tract-home lots in a builder's subdivision, many of them beyond the water and sewer lines in town, and the homes placed on them have mostly been factory-built. The MLS bears this out: 147 of the manufactured homes sat on one to 2.49 acres and another 105 on 2.5 to 4.99 acres. Only 70 sat on less than half an acre.
The age mix also shows that this is still happening. Of the 386 manufactured homes that sold, 79 were built in 2020 or later, 70 of them in Silver Springs, and 13 were built in 2025 or 2026. By contrast with the older stock, these are recent homes, so new manufactured homes are still being added to the area's lots. By contrast, only three site-built houses that sold in the three years were built in 2020 or later.
For a buyer, this means most of the nearby sales to compare against are manufactured homes. Our manufactured vs modular homes guide explains how the two are built and titled, and our Nevada manufactured home financing guide covers the loan rules, including the foundation and title questions lenders ask about before they will lend on one.

How do Silver Springs and Stagecoach differ?
They share a ZIP code, but the two towns sell differently. Silver Springs is the larger market: 295 of the 386 manufactured-home sales, 39 of the 70 site-built sales and 278 of the 335 land sales from October 2023 through September 2026. It has the area's small in-town lots, almost all of the homes on public sewer, the Lahontan Reservoir shoreline and most of the newer manufactured homes. Stagecoach, to the west toward Dayton, is smaller and sells for more: a $349,900 median for manufactured homes against $310,000 in Silver Springs, and $460,000 for site-built houses against $340,000.
Part of that gap is land. The median Stagecoach site-built house sat on two acres, twice the Silver Springs median. The rest is utilities and the type of parcel on offer. Every one of the 31 Stagecoach houses that sold recorded a septic tank, and 15 recorded public water (in Stagecoach, the general improvement district's system) with no well, while the other 16 recorded a private well. In Silver Springs, 15 of 39 houses recorded both public water and public sewer, mostly on smaller lots in town.
Stagecoach manufactured homes also went under contract faster in the latest year: a median 22 days for 32 homes in the 12 months ending September 2026, against 31 days for 96 in Silver Springs. Site-built houses ran the other way over the three years (38 days in Stagecoach against 23), so with samples this size treat either as a hint rather than a rule.
Lahontan Reservoir is the other difference. The Lahontan State Recreation Area has a Silver Springs address, and Nevada State Parks describes 69 miles of shoreline with boating, fishing, camping and horseback riding, with a $5 day-use fee for Nevada vehicles, as read November 18, 2026. Our Dayton-area Stagecoach page describes Stagecoach, and our Northern Nevada communities page lists the rest of the region.
What does lot size do to price and utilities?
Lot size is the biggest single driver of price in ZIP 89429, and it also tells you, almost to the parcel, which utilities a home has. The table below splits the 386 manufactured-home sales from October 2023 through September 2026 by recorded lot size. Site-built houses follow the same pattern with fewer sales.
| Lot size | Sales | Median price | Most common water and sewer |
|---|---|---|---|
| Under 0.5 acre | 70 | $250,000 | Public water and public sewer on 66 of 70 |
| 0.5 to 0.99 acre | 50 | $298,500 | Public water and public sewer on 44 of 50 |
| 1 to 2.49 acres | 147 | $330,000 | Public water with septic on 69, well and septic on 65 |
| 2.5 to 4.99 acres | 105 | $355,000 | Well and septic on 98 of 105 |
| 5 acres or more | 14 | $397,000 | Well and septic on all 14 |
The break at one acre matters. Below it, almost every home recorded public water and public sewer, so the owner pays a monthly water and sewer bill and has no well or tank to maintain. From one to 2.49 acres the area splits roughly in half between homes on a public water line with a septic tank and homes with both a private well and a septic tank. From 2.5 acres up, nearly every home has its own well and septic.
Price climbs with land, but not by much per acre. Going from under half an acre to five acres or more raised the median manufactured-home price by $147,000, from $250,000 to $397,000, while the land itself added several acres. Buyers who want room for animals, shops or privacy get a lot of land for the money here. Buyers who want low upkeep and a predictable monthly bill will find it on the smaller lots in town.
Recorded MLS data are agent-entered, so read each listing's water and sewer fields and then confirm them yourself. Our Nevada well and septic buyer guide explains what to test and inspect on a well-and-septic home before you remove your contingencies.

Are newer manufactured homes worth more than older ones?
Yes, up to a point. The age line that matters most for financing is June 15, 1976: HUD says every manufactured home built in the U.S. after that date must be certified by its manufacturer to HUD's construction and safety standards and carry a red certification label on each section. Of the 386 manufactured homes that sold from October 2023 through September 2026, 77 were built before 1990 and sold for a median $228,000. Homes built in the 1990s sold for $299,950 (124 sales), and those built from 2000 through 2009 for $364,000 (86 sales).
Then the curve flattens. The 20 homes built in the 2010s sold for $347,000 and the 79 built in 2020 or later for $344,900, both below the 2000s homes. The reason is land, not age: the 2000s homes sat on a median of almost two acres, while the newest homes sat on about one acre, often on lots in Silver Springs that had been empty until the home arrived. A new 1,605-square-foot home on an acre selling for about the same as a 20-year-old home on two acres tells you what the extra acre is worth to buyers here.
New homes also took longer to sell. The median 2020-or-newer manufactured home went under contract 51 days after listing, against 36.5 days for all manufactured homes. The data doesn't show why; ask the listing agent whether a new home is fully set up, inspected and ready to close.
If you are weighing a new manufactured home on a vacant lot against an older one, compare the whole package: the foundation, whether the home has been converted to real property, the well, the septic system, and what the lot would cost on its own. Homes from before June 15, 1976 predate the HUD standards and certification label, and the financing guide linked above explains why that limits the loans available on them. The financing guide linked above covers which loans accept which homes. A home inspector who knows manufactured homes is worth the fee; our Northern Nevada home inspection guide lists what to ask for.
| Built | Sales | Median price | Median price per sq ft | Median lot | Median days to an accepted offer |
|---|---|---|---|---|---|
| Before 1990 | 77 | $228,000 | $180 | 0.92 acre | 32.5 |
| 1990 to 1999 | 124 | $299,950 | $231 | 1.03 acres | 40 |
| 2000 to 2009 | 86 | $364,000 | $223 | 1.97 acres | 23 |
| 2010 to 2019 | 20 | $347,000 | $203 | 1.02 acres | 30 |
| 2020 or newer | 79 | $344,900 | $217 | 1.01 acres | 51 |
How do site-built houses compare with manufactured homes?
Site-built houses are scarce here. Only 70 sold in the 36 months from October 2023 through September 2026, about two a month, and on November 18, 2026 just seven were listed, four of them already under contract. If you want a stick-built house in ZIP 89429, expect to wait for one and to act quickly when it appears.
They cost more, but less than you might expect. The median site-built house sold for $375,000, or $243 per square foot, against $322,370 and $213 for a manufactured home. In the 12 months ending September 2026, the gap between the two medians was $43,000 ($375,000 against $332,000). Site-built houses were also slightly larger, at a median 1,642 square feet, and sat on slightly more land, 1.16 acres.
Price per square foot is the fairer comparison, because the site-built houses are bigger. On that basis a site-built house ran about 14% more than a manufactured home over the three years. Some of the most expensive sales in the ZIP were site-built homes on acreage: the 14 houses on five acres or more, 11 of them in Stagecoach, sold for a $495,000 median, and every one of them recorded a well and septic tank.
The utilities on site-built houses follow the same pattern as the rest of the area. Of the 70, 34 recorded a private well and septic tank, 18 public water with a septic tank, and 15 public water and public sewer. The houses on public sewer were all in Silver Springs and mostly on lots under half an acre.
Financing is simpler on a site-built house. Conventional, FHA and VA loans treat it as an ordinary house, so the buyer pool is wider. That can help on resale, though in this market both kinds of home sold within a few weeks of listing in the latest year. Our buyer resources explain pre-approval and making an offer.
What does vacant land cost, and why does it sit so long?
Vacant land is the largest category of listings in ZIP 89429 and the slowest to sell. From October 2023 through September 2026, 335 land parcels sold at a median $42,000 on 4.39 acres. In the 12 months ending September 2026, 127 parcels sold for a median $39,000. On November 18, 2026, 175 land listings were on the market, and only 10 were under contract.
| Parcel size | Sales | Median price | Median days to an accepted offer | Median sale vs first asking price |
|---|---|---|---|---|
| Under 0.5 acre | 18 | $49,750 | 49 | 87.3% |
| 0.5 to 0.99 acre | 14 | $46,000 | 34 | 83.5% |
| 1 to 2.49 acres | 103 | $28,500 | 60 | 90.0% |
| 2.5 to 4.99 acres | 140 | $35,000 | 75 | 88.2% |
| 5 acres or more | 60 | $57,500 | 151.5 | 84.4% |
Two things stand out. First, an acre of rural land here can cost less than a small in-town lot, because the small lots usually have water and sewer at the street and the acreage does not. The agent-entered water field on 148 of the 335 land sales said a well was needed, and only 66 recorded public water. Second, land took a median 77 days to go under contract and closed at 88% of its first asking price, well below the 98% that manufactured homes fetched. Prices were uneven from year to year as well: the median was $34,500 in the 12 months ending September 2024, $47,875 a year later and $39,000 in the latest year.
The sticker price is only the start. A buyer who plans to place a home on a bare parcel will pay for a well (if no water line reaches it), a septic system, a power connection, a driveway, the foundation and the home itself, plus county permits. Get written quotes for each before you commit, and ask the county what it requires to place a home on that parcel. Our guide to buying land near Reno and Sparks walks through the water, power and permit questions, and the same questions apply in Lyon County.

Who supplies the water, and what does it cost each month?
Two different water systems serve the two towns, and many parcels have neither. Which one a property uses changes the monthly bill and the risks you take on.
In Silver Springs, the water company is the Silver Springs Mutual Water Company. Its 2025 water conservation plan, filed with the Nevada Division of Water Resources, says it serves the town through 1,217 service connections to an estimated 3,043 people, drawing on three wells and running two of them through an arsenic removal treatment plant. The same plan sets a $55 flat monthly rate for the first 15,999 gallons, then $5 per 1,000 gallons up to 30,999 and $6 per 1,000 above that. It names development along USA Parkway and nearby industrial growth among the reasons conservation matters.
Sewer in Silver Springs is separate. Lyon County's utilities department says it provides sewer service for Silver Springs, and its wastewater page says the Silver Springs treatment plant has served the area since 2000, with a capacity of 0.499 million gallons a day.
In Stagecoach, water comes from the Stagecoach General Improvement District. Its October 2025 conservation plan says it serves 610 metered customers, about 1,760 people in 2024, from two wells in the Dayton Valley groundwater basin, across a district of about 65 square miles. Residential customers pay $66 a month for 18,000 gallons plus $3 for each 1,000 gallons above that, rates set on April 11, 2024.
| Measure | Silver Springs Mutual Water Company | Stagecoach General Improvement District |
|---|---|---|
| Customers | 1,217 service connections | 610 metered customers |
| Population served | About 3,043 (2025) | About 1,760 (2024) |
| Supply | Three wells, arsenic treatment plant | Two wells, Dayton Valley basin |
| Base residential charge | $55 a month, up to 15,999 gallons | $66 a month, up to 18,000 gallons |
| Usage above the base | $5 then $6 per 1,000 gallons | $3 per 1,000 gallons |
| Sewer | Lyon County Utilities, in parts of town | Septic on every Stagecoach house sold |
Ask the seller for 12 months of water and sewer bills, and confirm with the utility that the account and any connection are in good standing before closing.
When will you need a well and septic system?
On most land of an acre or more, and on almost everything from 2.5 acres up. Of the 70 site-built houses that sold from October 2023 through September 2026, 34 had a private well and septic tank, and 148 manufactured homes in Silver Springs and 29 in Stagecoach did too. On vacant land, 148 of the 335 parcels sold recorded that a well would still need to be drilled.
Nevada law lets you drill a well for household use without a water-right permit, within limits, though the State Engineer can still require information and, in designated basins, registration. NRS 534.180 says the water-permit chapter does not apply to a domestic well whose draught does not exceed 2 acre-feet per year, except for the information the State Engineer requires. NRS 534.110 adds that where the State Engineer or a court restricts pumping to priority water rights, a domestic well must still be allowed to withdraw 0.5 acre-feet of water per year, recorded by a meter. A household that waters a large yard or keeps animals should keep that lower figure in mind.
What a well costs to drill depends on the depth to water, and depth varies across a ZIP code this large. For any parcel you are considering, look up the well logs for nearby wells in the Division of Water Resources well log database to see how deep neighbours had to go, and get a driller's written quote. Before you buy a home with an existing well, have the water tested for bacteria and arsenic and the flow rate measured; the Silver Springs water company itself treats two of its three wells for arsenic.
A septic system needs its own inspection: a pump-out, a look at the tank and baffles, and a check of the drain field. Septic repairs are among the costliest surprises on a rural home, so make the inspection a condition of your contract. Our Northern Nevada homes with acreage guide compares the well-and-septic trade-off across the wider region.
What will property taxes be on a home here?
Lower than the rate suggests, at least for a while. The Nevada Department of Taxation's fiscal 2026-27 rate book lists the tax districts in the Silver Springs/Stagecoach Hospital District and the Stagecoach GID district at a combined $3.66 per $100 of assessed value, against $2.9969 for the unincorporated Lyon County districts outside them. Assessed value is 35% of taxable value, so each $100,000 of taxable value costs about $1,281 a year at the $3.66 rate.
The bills on the listings show how far below sale prices the tax runs. The tax amount recorded on the 70 site-built houses that sold from October 2023 through September 2026 came to a median 0.40% of the sale price. On manufactured homes built before 2020 it was 0.28%. On the 78 newer manufactured homes with a recorded tax figure it was only 0.11%, a figure that looks too low for a new home. Ask the Lyon County Assessor what the bill will be with the home included rather than relying on the listing.
The same rate book notes that NRS 361.4723 and 361.4724 abate taxes above a 3% yearly increase on owner-occupied homes and qualifying rentals, while other property is abated by a formula that can't exceed 8%. The recorded tax figure on any listing is the seller's capped bill, not yours. Our Nevada property tax cap explainer shows how the 3% and 8% caps work and why a buyer must claim the 3% primary-residence cap rather than assume it carries over.
On a $375,000 site-built house, the recorded median works out to roughly $1,500 a year. On a $322,370 manufactured home built before 2020, it is closer to $900. Budget from the actual bill on the parcel and its tax district, which is printed on the bill, and ask the assessor whether the home is assessed with the land or separately.
How does ZIP 89429 compare with Fernley and Dayton?
Buyers priced out of Fernley and Dayton often look east and south to Silver Springs and Stagecoach. The comparison below uses the same 12 months, October 2025 through September 2026, and the same MLS definitions for each ZIP code.
| Measure | Silver Springs and Stagecoach (89429) | Fernley (89408) | Dayton (89403) |
|---|---|---|---|
| Site-built house sales | 21 | 402 | 378 |
| Median price | $375,000 | $414,500 | $469,970 |
| Median price per sq ft | $249 | $253 | $260 |
| Median lot | 1.01 acres | 0.19 acre | 0.22 acre |
| Median year built | 2004 | 2004 | 2014 to 2015 |
| Median days to an accepted offer | 26 | 18 | 25 |
| Manufactured share of detached sales | 85.9% | 5.6% | 9.4% |
Per square foot of house, the three markets are close, between $249 and $260. The difference is in what comes with the house. A Fernley or Dayton house typically sits on about a fifth of an acre in a subdivision with public water and sewer. A Silver Springs or Stagecoach house typically sits on an acre, often with a well and septic tank, and in the 12 months ending September 2026 cost about $40,000 less than in Fernley and $95,000 less than in Dayton at the median.
The small ZIP 89429 sample (21 houses, 14 in Silver Springs and 7 in Stagecoach) makes that comparison rough. Manufactured homes look different: $332,000 in ZIP 89429 on 128 sales, $332,000 in Fernley on 24 and $365,000 in Dayton on 39. Dayton's manufactured homes sat on about an acre too, so that comparison is closer than the house one. If you are deciding between these towns, our Fernley neighborhoods guide and moving to Dayton guide describe what each offers, and our Fernley homes page and Dayton homes page list current homes.
How long do homes take to sell, and how close to asking?
Homes in ZIP 89429 sold at a steady pace. The median manufactured home went under contract 36.5 days after listing across the 36 months from October 2023 through September 2026, and 29 days in the 12 months ending September 2026. The median site-built house took 26 days. Manufactured homes sold for a median 98.2% of their original asking price, and site-built houses for 97.7%. Land was the exception, at 77 days and 88%.
The year-by-year numbers show a market that slowed and then picked up again. In the 12 months ending September 2024, the median manufactured home sold for $330,000 after 38 days. In the following year it sold for $300,000 after 51 days. In the 12 months ending September 2026 it sold for $332,000 after 29 days, with 128 sales. The monthly count of home sales stayed between 9 and 20 throughout the three years, with no month that looked like a feed artifact.
For sellers, these numbers say three things. First, a well-priced home here sells within about a month, so a home that has sat for two months or more is probably priced above what buyers will pay. Second, the comparable sales that matter are homes of the same kind, on similar land, with the same utilities, not a ZIP-wide median. A manufactured home on two acres with a well should be priced against other manufactured homes on acreage, not against the in-town homes on public sewer. Third, land sells slowly and usually for less than its first price, so a lot owner who needs to sell should price close to recent sales of similar parcels from the start.
On November 18, 2026, 27 manufactured homes were listed without a contract against 128 sold in the latest year, roughly two and a half months of supply. Land had about 15 months. Our seller resources explain the listing process.
What is for sale in Silver Springs and Stagecoach right now?
On November 18, 2026, the MLS showed 228 listings in ZIP 89429 that were for sale or under contract, plus four commercial listings. The mix mirrors the sales: 46 manufactured homes, seven site-built houses and 175 land parcels.
The 46 manufactured homes carried a median asking price of $355,050 and ranged from $155,000 to $605,000. Nineteen were already under contract, 35 were in Silver Springs and 11 in Stagecoach. The seven site-built houses had a median asking price of $499,000, from $336,000 to $775,000, and four were under contract. With so few site-built houses on the market, a buyer who wants one should be pre-approved and ready to see a new listing the day it appears.
The 175 land listings carried a median asking price of $59,900, well above the $39,000 median that land actually sold for in the latest year, and 165 of them were still waiting for a buyer. The 165 without a contract had a median size of 4.62 acres. That gap between asking and selling prices on land is a negotiating point for buyers. Ask the listing agent how long a parcel has been on the market and whether it has been listed before, and compare the asking price with recent sales of similar parcels in the same part of the ZIP code before you make an offer.
Asking prices are not sale prices, and a listing count on a single day moves as homes sell and new ones arrive. For current homes and new listings, see our Silver Springs homes page and Stagecoach homes page, or set up a search on our home search for ZIP 89429.
When a listing interests you, read its water, sewer and lot fields first, then check them against the utility and the county before you schedule a showing that may not fit your plans.
What should you check before buying in Silver Springs or Stagecoach?
Rural purchases turn on details a listing summary leaves out. Work through this list during your inspection period, and make anything you can't confirm a condition of the contract.
The home itself. On a manufactured home, find out whether it sits on a permanent foundation and whether it has been converted to real property, and get the HUD label and data plate information your lender will ask for. Check the year built: a home from before June 15, 1976 is outside the HUD code and is hard to finance with a mortgage. Our manufactured home financing guide covers each loan type's rules.
Water and sewer. Confirm which water system serves the parcel, or whether it relies on a private well. On a well, order a water test (including arsenic) and a flow test, and read the well log. On septic, order a pump-out and inspection. In town, confirm the sewer connection with Lyon County Utilities.
Land you plan to build on. If a parcel needs a well, septic, power and a driveway, get written quotes for each and ask Lyon County what it requires to place a home there before you commit.
Taxes. Read the tax district on the current bill, budget from that bill rather than the listing figure, and file for the 3% primary-residence cap if the home will be your residence. On a newly placed manufactured home, ask the assessor what the bill will be once the home is assessed.
Insurance. Get a quote early, especially on an older manufactured home or a property near open range, and confirm it before your contingency ends; our Northern Nevada wildfire insurance guide explains what changed in 2026.
When you're ready to tour homes in Silver Springs or Stagecoach, or to price one to sell, reach our Northern Nevada team through our contact page or at (775) 277-2120. If you're moving from outside the area, our Reno relocation guide covers the wider region.
Frequently Asked Questions
How much does a house cost in Silver Springs, Nevada?
The middle half of home sales in ZIP 89429 closed between $275,000 and $380,000 from October 2023 through September 2026. The 386 manufactured homes sold for a $322,370 median and the 70 site-built houses for $375,000. In Silver Springs alone, the medians were $310,000 for manufactured homes and $340,000 for site-built houses.
Is Stagecoach, NV more expensive than Silver Springs?
Yes. From October 2023 through September 2026, Stagecoach manufactured homes sold for a $349,900 median against $310,000 in Silver Springs, and Stagecoach site-built houses for $460,000 against $340,000. Stagecoach homes typically sat on more land, and every Stagecoach house that sold recorded a septic tank.
Why are so many Silver Springs homes manufactured?
Most homes that sold sat on rural lots of an acre or more, many beyond the water and sewer lines in town, and most of those homes were factory-built. In the 12 months ending September 2026, manufactured homes were 85.9% of detached home sales in ZIP 89429, against 5.6% in Fernley.
How much does land cost in Silver Springs and Stagecoach?
The 335 land parcels that sold from October 2023 through September 2026 closed at a $42,000 median on 4.39 acres. Silver Springs land sold for a $35,000 median and Stagecoach land for $82,500. Land took a median 77 days to go under contract and sold for 88% of its first asking price.
Do Silver Springs homes have wells and septic systems?
Many do. Of the 70 site-built houses that sold from October 2023 through September 2026, 34 had a private well and septic tank. Homes on lots under half an acre in Silver Springs almost all recorded public water and public sewer, and from 2.5 acres up nearly every home had its own well and septic.
What is the water bill in Silver Springs and Stagecoach?
Silver Springs Mutual Water Company charges a $55 flat monthly rate up to 15,999 gallons, then $5 and $6 per 1,000 gallons, according to its 2025 conservation plan. The Stagecoach General Improvement District charges $66 a month for 18,000 gallons plus $3 per 1,000 gallons over, rates set April 11, 2024.
What is the property tax rate in Silver Springs, NV?
For fiscal 2026-27, the Nevada Department of Taxation lists the tax districts in the Silver Springs/Stagecoach Hospital District at $3.66 per $100 of assessed value, which is 35% of taxable value. Listing tax bills on site-built houses sold from October 2023 through September 2026 came to a median 0.40% of the sale price.
Which sources inform this Silver Springs guide?
MLS study. Sales and listing data come from the Northern Nevada Regional MLS through Repliers, pulled November 18, 2026. We retrieved every sold listing in ZIP 89429 with an MLS closing date from October 1, 2023 through September 30, 2026, the newest settled 36 months, and every active and under-contract listing on November 18, 2026. A record counted as a sale only when its raw MLS status was Closed; five records whose raw status still read "Active Under Contract" were left out. Of the 796 closed sales, 115 arrived without raw MLS fields and were counted from Repliers' top-level fields (price, closing date, size, lot, year built, water, sewer and tax). Home types follow the MLS property type and subtype: 386 manufactured homes, 70 site-built single-family houses, 335 land parcels and five commercial sales, which were left out. Town follows the MLS city field (Silver Springs or Stagecoach); two records with another city were placed by map point. Days to an accepted offer run from the listing date to the purchase contract date. For the comparison, we pulled sold listings in Fernley ZIP 89408 and Dayton ZIP 89403 closed October 1, 2025 through September 30, 2026 under the same rules. A random sample of 10 records was checked by street address against its town, map point and property type (saved as spot-check.txt with the output). The analysis script is scripts/silver-springs-stagecoach-study.ts, and its output is kept with this post's records.
Limits. The MLS records only agent-listed sales, so private and for-sale-by-owner sales are missing. Lot size, water, sewer and tax amounts are agent-entered. Buyer financing was recorded on too few sales to report. Counts can differ slightly from other NREG posts that classified homes by the MLS style field or pulled on a different date: our ranking of the cheapest places to buy near Reno, Sparks and Carson City counted 130 manufactured-home closings in ZIP 89429 for the same 12 months, against 128 here. Months of supply is a rough gauge built from one day's listings.
Water, sewer and wells. The Silver Springs Mutual Water Company and Stagecoach General Improvement District water conservation plans (2025) on the Nevada Division of Water Resources site; Lyon County's Utilities and Wastewater pages; Nevada Revised Statutes 534.180 and 534.110; the Division of Water Resources well log database. All read November 18, 2026.
Taxes. The Nevada Department of Taxation's Property Tax Rates for Nevada Local Governments, fiscal year 2026-2027 (Lyon County district tables and abatement note), read November 18, 2026.
Recreation and manufactured-home standards. Nevada State Parks' Lahontan State Recreation Area page and HUD's manufactured housing homeowner resources page, both read November 18, 2026.
This guide is general information, not legal, tax or lending advice. Confirm utilities, tax district and permit requirements for a specific property with the utility, Lyon County and your own inspectors.